| Total Projects Found: 5 |
Result Pages: 1 |
|
 |
Cheesman Dam - High Altitude/Deep Dive
Project Date: 2008
Mixed gas diving gear, multiple hyperbaric chambers, barges, multiple cranes and other equipment were mobilized to a remote, high mountain lake in Colorado. The work scope included cutting away... (More) |
| |
|
 |
King County Outfall/Mixed Gas Diving
Project Date: 2007
Our team provided a 90 foot Dive Support Vessel, mixed gas diving gear, multiple hyperbaric systems, remotely operated vehicles, sonar and other equipment to perform underwater work... (More) |
| |
|
 |
Unalaska Anode Project
Project Date: 2010
For this project our team collaborated with Pacific Pile & Marine to complete an extensive galvanic cathodic protection installation. A four man dive crew mobilized all equipment and materials... (More) |
| |
|
 |
Upper Baker Floating Surface Collector
Project Date: 2008
Supporting prime contractor Natt McDougall Company on the construction of the Floating Surface Connector at the Upper Baker Dam owned by Puget Sound Energy was a highly complex project... (More) |
| |
|
 |
Cruise Ship Anchor Recovery
Project Date: 2010
Responding to a Cruise Ship operator who lost an anchor in over 200’ in Alaskan waters, with limited coordinates. In less than 24 hours we mobilized an eight man dive team, a full mixed gas diving suite, a side scan sonar system and an inspection class ROV to the site in Sitka Alaska. (More) |
| |
|
|
|
| |
|